Peak traffic versus cleaning
Peak foot traffic conflicts with cleaning schedules, and stains differ sharply by area — dining-floor oil is the hardest.

A mall mixes open atria, multi-level corridors and oil-heavy dining floors. C5 scrubs overnight and dust-mops through the day, across floors and zones.
Oil, dust, footfall and the hours you can clean decide the plan before a model does.
Peak foot traffic conflicts with cleaning schedules, and stains differ sharply by area — dining-floor oil is the hardest.
Low cleaning efficiency and an inconsistent floor finish, with limited flexibility in redeploying the team.
An opaque cleaning process with no effective controls, which raises training and management cost.
The machines, the zones they cover and the records that prove what happened.
Three choices that change how the site runs.
A full overnight scrub plus all-day dust mopping lifts effective cleaning frequency and improves quality.
Elevator integration enables seamless cross-floor and cross-zone cleaning.
Continuous scrubbing with cleaning agent removes oil while collecting debris, leaving no residue.
Zone by zone, in the order the site actually runs them.
The same work, before and after, on the metrics that matter to this site.
| Metric | Manual cleaning | With BRAWN robots |
|---|---|---|
| Manual cleaning load | Multiple manual passes per zone | Continuous coverage with fewer manual passes |
| Daily cleaned area | Limited by available staff | Over 8,000 m² per day |
| Working hours | Daytime work disturbed by customers | Overnight scrub plus daytime mop |
| Customer perception | Manual cleaning visible to shoppers | Robot operation lifts the venue image |
Comparison figures are typical-scenario estimates from the solution handbook, not client measurements.
From the first survey to a running fleet: the same four steps on every project.
A walk-through of areas, surfaces, obstacles, lift and access-control conditions, plus the plumbing available for a docking station.
Model mix, zone plan, cleaning frequency and consumable estimate. A labour comparison is included only when the customer supplies a reliable baseline; the current answer set has no verified before-and-after labour case.
Staging plan, charging and docking positions, network and lift integration scope, and a training schedule for the operating team.
The cloud platform reports equipment status and faults, and self-check covers sensors, motors and the main controller. Partners receive remote technical support for genuine product faults; site-network, water or drainage problems remain site responsibilities.
We can still run a sizing estimate for your site, and arrange a visit to a comparable project where the client agrees.